1. Introduzione
This manual provides essential information for the safe and efficient installation, operation, and maintenance of the Siemens Burner Program Controller Box. These controllers are designed to manage the operational sequence of gas burners, specifically applicable to Italian RIELLO 40GS series, 40FS series, GAS series, and RS series gas burners. The program controller ensures the burner operates according to a predefined sequence, suitable for both single-stage e due-stage burner applications.

2. Informazioni sulla sicurezza
Please read and understand all safety instructions before installing, operating, or performing maintenance on the burner program controller. Failure to follow these instructions may result in property damage, serious injury, or death.
- L'installazione e la manutenzione devono essere eseguite solo da personale qualificato e autorizzato.
- Disconnect all power to the burner and controller before performing any work.
- Assicurare una corretta messa a terra e un cablaggio adeguato in conformità alle normative elettriche locali e nazionali.
- Do not operate the controller if it is damaged or malfunctioning.
3. Configurazione e installazione
The burner program controller is designed for integration into compatible RIELLO burner systems. Professional installation is highly recommended due to the electrical nature of the device.
3.1 Identifying Your Controller Model
Refer to the labels on your specific controller to identify the model number. The following images show common models:




3.2 Wiring the Controller Base
The controller connects to the burner system via a dedicated base unit, which features screw terminals for electrical connections. Ensure all wiring is secure and correctly terminated.


Fasi di installazione:
- Ensure the main power supply to the burner system is completely disconnected.
- Mount the controller base securely in the designated location within the burner control panel.
- Connect the electrical wiring from the burner components (e.g., ignition transformer, fuel valves, flame sensor) to the appropriate terminals on the controller base. Refer to the specific wiring diagram provided with your RIELLO burner for correct terminal assignments.
- Once all wiring is complete and verified, carefully insert the program controller box into its base, ensuring it is firmly seated.
- Restore power to the burner system and proceed to operational testing.
4. Istruzioni per l'uso
The Siemens Burner Program Controller automates the startup, operation, and shutdown sequences of the burner. It continuously monitors the burner's status and flame presence to ensure safe and efficient operation.
4.1 Funzionamento normale
- Upon power-up, the controller initiates a self-check sequence.
- It then proceeds through the pre-purge phase, followed by ignition and flame establishment.
- Once a stable flame is detected, the controller maintains burner operation according to the set parameters.
- In case of flame failure or other faults, the controller will initiate a safety shutdown.
4.2 Reimpostazione del controller
If the burner enters a lockout state due to a fault, the controller typically has a reset button (often visible through a small window or indicated by an LED). Pressing this button will attempt to restart the burner sequence. If the fault persists, refer to the Troubleshooting section.
5. Manutenzione
Regular maintenance ensures the longevity and reliable operation of your burner program controller. Always disconnect power before performing any maintenance.
- Ispezione visiva: Periodically inspect the controller and its connections for any signs of damage, corrosion, or loose wiring.
- Pulizia: Keep the controller clean and free from dust and debris. Use a soft, dry cloth for cleaning. Do not use abrasive cleaners or solvents.
- Condizioni ambientali: Ensure the operating environment remains within specified temperature and humidity ranges to prevent damage to electronic components.
6. Risoluzione Dei Problemi
If the burner system fails to operate correctly, consider the following basic troubleshooting steps. For complex issues, contact a qualified technician.
- Nessun potere: Check the main power supply to the burner and ensure all circuit breakers are on. Verify connections to the controller base.
- Burner Fails to Start: Ensure the fuel supply is open and sufficient. Check for any error codes or indicator lights on the controller. A lockout might require a manual reset.
- Guasto alla fiamma: Inspect the flame sensor for cleanliness and proper positioning. Ensure adequate combustion air supply.
- Repeated Lockouts: This often indicates a persistent issue within the burner system. Do not repeatedly reset the controller without addressing the underlying problem. Consult a professional.
7. Specifiche
| Caratteristica | Specificazione |
|---|---|
| Numeri di modello | RMG88.62C2, RMO88.53C2, RMG/M88.62C2, CMG88.62D2 |
| Produttore | Siemens (LM088.620C2RL equivalent) |
| Voltage | 220-240V~ |
| Frequenza | Frequenza |
| Tipo | Burner Program Controller (Valves) |
| Tipo di motivazione | Other (Electronic Control) |
| Certificazione | CE |
| TSA (Trial for Safety) | 3s (for RMG88.626C2) |
| T8 (Pre-purge time) | ≥ 20s (for RMG88.626C2) |
| Dimensioni della confezione (circa) | Lunghezza: 10 cm, Larghezza: 10 cm, Altezza: 10 cm |
| Peso del pacco (circa) | 0.5 kg |
8. Garanzia e supporto
For warranty information and technical support, please contact the seller, Pneumatic Home Store, or refer to the documentation provided at the time of purchase. Ensure you have your product model number and purchase details available when seeking support.
9. Suggerimenti per l'utente
Non sono stati forniti suggerimenti specifici per l'utente da parte di reviews or Q&A for this product. However, general best practices for industrial control components include:
- Always ensure the controller is installed in a location protected from excessive heat, moisture, and vibration.
- Regularly check for firmware updates from the manufacturer if applicable, though this device is typically a fixed-function controller.
- Keep a spare unit on hand for critical applications to minimize downtime in case of failure.





