BFT P125002 SB-BAT

Manuale utente del kit di backup della batteria 24 V CC per apricancello BFT P125002 SB-BAT

Model: P125002 SB-BAT

1. Prodotto finitoview

The BFT SB-BAT (P125002) is a 24v DC battery backup system designed to ensure continuous operation of your gate opener even during power outages. This kit provides a reliable power source, activating automatically when the main power supply is interrupted and recharging when power is restored.

It is compatible with various BFT gate opener models, including the Deimos BT series, VIRGO - LINX, EOS-SCE, HYDRA N, DEIMOS BT-QSC D-NETTUNO S, SB BAT/SB CARBAT (DEIMOS BT-SB 300), BT BAT 2 (URANO BT ARES 1000 & ARES 1500) NETTUNO B, VENERE D, ARGO, LIBRA C MA - LIBRA C LX.

BFT P125002 SB-BAT Battery Backup Kit components

Figure 1: Contents of the BFT P125002 SB-BAT Battery Backup Kit, including batteries, wiring, and mounting hardware.

2. Configurazione e installazione

Installation of the BFT SB-BAT kit is designed to be straightforward. It integrates with your existing BFT gate opener system.

2.1. Precauzioni di sicurezza

2.2. Fasi di installazione

  1. Disimballare i componenti: Carefully remove all items from the packaging. Verify all components are present as shown in Figure 1.
  2. Mount the Battery Housing: Securely mount the battery housing unit near your gate opener's control board, ensuring it is protected from environmental elements.
  3. Collegare le batterie: Insert the two 12V 1.2Ah batteries into the housing. Connect them according to the wiring diagram provided with the kit (typically in series to achieve 24V DC).
  4. Connect to Gate Opener: Connect the battery backup system's wiring to the designated battery input terminals on your BFT gate opener's control board. Consult your gate opener's manual for precise terminal locations.
  5. Cablaggio sicuro: Ensure all wiring is neatly routed and secured to prevent accidental disconnections or damage.
  6. Ripristina alimentazione: Once all connections are secure and verified, restore main power to the gate opener. The smart charger board will begin charging the batteries.
Close-up of BFT P125002 SB-BAT components including batteries and wiring

Figura 2: Uno sguardo più da vicino view of the battery backup kit components, highlighting the batteries and connection wires.

3. Funzionamento

The BFT SB-BAT battery backup system operates automatically to provide uninterrupted gate functionality.

4. Manutenzione

Regular maintenance ensures the longevity and reliability of your battery backup system.

5. Risoluzione Dei Problemi

This section addresses common issues you might encounter with your BFT SB-BAT battery backup kit.

ProblemaPossibile causaSoluzione
Gate does not operate during power outage.
  • Le batterie non vengono caricate.
  • Collegamenti elettrici allentati o errati.
  • Batteries are at end of life.
  • Fusibile bruciato.
  • Ensure main power is connected and the charger board is functioning. Allow 12-14 hours for full charge.
  • Check all wiring connections between the battery kit and the gate opener.
  • Test batteries; replace if necessary.
  • Controllare e sostituire il fusibile da 20 A se bruciato.
Batteries do not seem to be charging.
  • Problema con l'alimentazione principale.
  • Faulty charger board.
  • Collegamento errato della batteria.
  • Verify main power to the gate opener.
  • Contact BFT support for charger board diagnosis.
  • Recheck battery wiring according to the manual.

6. Specifiche

Key technical specifications for the BFT SB-BAT (P125002) battery backup system:

7. Garanzia e supporto

For warranty information or technical support, please refer to the documentation included with your purchase or contact BFT customer service directly. Keep your proof of purchase for warranty claims.

You can find more information about BFT products on their official websito o tramite distributori autorizzati.

Documenti correlati - P125002 SB-BAT

Preview BFT DEIMOS BT UL/CSA Sistema di automazione per cancelli elettromeccanici
Scopri BFT DEIMOS BT UL/CSA, un sistema di automazione elettromeccanico per cancelli scorrevoli a cremagliera. Dotato di tecnologia intelligente, funzionamento sicuro a 24 V e installazione semplificata, questo sistema migliora la sicurezza e la praticità del cancello. Esplora le specifiche tecniche e gli accessori disponibili per applicazioni residenziali e commerciali.
Preview Manuale di installazione dell'automazione per cancelli a battente BFT VIRGO
Manuale completo di installazione e utilizzo per il sistema di automazione per cancelli a battente BFT VIRGO, che copre sicurezza, specifiche tecniche, procedure di installazione, programmazione e manutenzione.
Preview Guida all'installazione del sistema di controllo radio BFT CLONIX1-2 e MITTO 2-4 433 MHz
Guida completa all'installazione del ricevitore BFT CLONIX1-2 e dei trasmettitori radiocomandati MITTO 2-4 433 MHz, che copre programmazione, clonazione, sicurezza e specifiche tecniche per l'automazione di cancelli e porte.
Preview Manuale di installazione BFT THALIA: Quadro Comandi per Automazione Cancelli
Questa guida dettagliata illustra l'installazione e la configurazione del quadro comandi BFT THALIA, progettato per l'automazione di cancelli e porte. Include specifiche tecniche, schemi di collegamento e istruzioni operative per garantire un funzionamento sicuro ed efficiente.
Preview Guida di riferimento rapido UL del kit BFT Phobos BT
Guida di riferimento rapido per il sistema di apertura automatica del cancello BFT Phobos BT Kit UL, che copre l'installazione, il cablaggio, la programmazione e la risoluzione dei problemi.
Preview Istruzioni per la codifica del telecomando BFT MITTO 2B | Telecomandi retrò
Guida passo passo per la codifica dei telecomandi BFT MITTO 2B per apricancelli, che illustra i metodi esistenti per i telecomandi e i ricevitori con schermo LCD. Include suggerimenti per la risoluzione dei problemi.